
Buttweld Carbon Steel Reducer , B16.9 Sch 40 Seamless Concentric Reducer
Contact Person : John Lee
Phone Number : +86-13663270486
WhatsApp : +8613663270486
Minimum Order Quantity : | 1 | Price : | 0.15 |
---|---|---|---|
Packaging Details : | Wooden box Wooden pallet | Delivery Time : | 10 |
Payment Terms : | L/C, T/T, D/P | Supply Ability : | 99999 |
Place of Origin: | CHINA | Brand Name: | Yi Sheng |
---|---|---|---|
Certification: | ISO 9001 BV | Model Number: | 1/2"-72" |
Detail Information |
|||
Color: | Black | Standard: | Astm |
---|---|---|---|
Package: | Wooden Box Wooden Pallet | Material: | Carbon Steel |
High Light: | ASTM Pipe Fittings Reducer,Ecc Pipe Fittings Reducer,1/2" Reducer Sch 40 |
Product Description
Carbon Steel Reducer Astm A234 Wpb Ecc Reducer Sch40
Products Description:
Reducer pipe fittings are used to connect two pipes with different diameters. According to the different shapes, it is divided into two types: concentric Reducer pipe fittings and eccentric Reducer pipe fittings. The materials of Reducer pipe fittings include stainless steel Reducer pipe fittings (304, 30408, 316, 316L), alloy steel and carbon steel Reducer pipe fittings. The materials of Reducer pipe fittings include No. 20 steel, Q235, Q345, 16Mn, etc.
ype | Carbon Steel Reducer Astm A234 Wpb Ecc Reducer Sch40 |
Size | Seamless Elbow:1/2"~24" DN15~DN600 Welded Tee: 1/2"~72" DN15~DN1800 |
Wall thickness | sch10, sch20, sch30, std, sch40, sch60, xs, sch80, sch100, sch120, sch140, sch160, xxs, std,sch5s, sch20s, sch40s, sch80s |
Standards | ANSI B16.9, ASME,DIN2506, JIS, BS,GOST |
Material | Carbon steel: ASTM/ASME A234 WPB,WPC, ST37-2,ST54 Alloy steel: ASTM/ASME A234 WP9-WP12-WP11-WP22-WP5-WP91 Stainless steel: ASTM/ASME A403 WP 304-304L, WP 316-316L,WP 321,201 |
Surface treatment | Transparent oil, rust-proof black oil or hot galvanized |
Packing | wooden case, pallet or as customers' requirement |
Applications | Petroleum, chemical, power, gas, metallurgy, shipbuilding, construction, etc |
Min order | 10 piece |
Delivery time | 7 after receipt of advanced payment |
Certification | ASME, ISO9001:2000 |
Delivery Term | FOB(30% down payment in advance, the balance before shipment) CIF or C&F(30% in advance , the balance against with the copy of B/L) |
Products Pictures:
Enter Your Message